Construction delays mean Saint-Henri pool closed for another summer

Saint-Henri pool

A pool in Montreal’s west end will be closed for a second consecutive summer amid construction delays, and Saint-Henri residents say they’re disappointed by the news.

condo for rent montreal

Powered by WPeMatico

This entry was posted in Montreal Blog. Bookmark the permalink.